Struxen Core Project management Free
The record of the job: drawings, specs, RFIs, submittals, schedule, daily logs, punch, meetings, inspections and photos.
Run the project.
Screens from the Struxen demo project.

Project home
F-22 Egress Maintenance Facility, demo project
The project’s home board: the week ahead, the site weather, today’s log, the punch list and live counts from the registers.
Drawings
F-22 Egress Maintenance Facility, demo project
Published sheets at their current revision, banded by discipline. Search by number or title, and filter by area, discipline and set.
Sheet viewer
F-22 Egress Maintenance Facility, demo project
Any sheet opens full bleed, to pan, zoom, mark up, measure and search its text. The chip at its top left carries the search and the download.
RFIs
F-22 Egress Maintenance Facility, demo project
Each RFI shows its status, whose move it is, the due date and the spec section. The reply marked official is the answer of record.
Submittals
F-22 Egress Maintenance Facility, demo project
Product data, shop drawings and samples by spec section, with who holds each one and for how long.
Schedule
F-22 Egress Maintenance Facility, demo project
A WBS grid and a Gantt over the same rows, from activities you enter or import.
Lookahead
F-22 Egress Maintenance Facility, demo project
What each company has committed to for the next one to four weeks, day by day. Moving a task here never moves the schedule.
Daily logs
F-22 Egress Maintenance Facility, demo project
One record per day: manpower, deliveries, visitors, delays and the notes that explain them. A completed day locks.
Punch list
F-22 Egress Maintenance Facility, demo project
Each item names who fixes it, who reviews the fix and who signs it off. Ball in court says whose move it is.
Meetings
F-22 Egress Maintenance Facility, demo project
Agenda and minutes in one record. Business items still open carry into the next meeting in the series.
Inspections
F-22 Egress Maintenance Facility, demo project
Checklists run in the field, with signatures. A failed line becomes a punch item or an observation in one tap.
Free.
Each module in Struxen Core, with its documentation.
Drawings
Upload the set as one PDF. Each sheet’s number and title are read, and you confirm them before anything is published.
Read the docs on DrawingsSheet viewer
Any sheet full bleed: pan, zoom, notes, markup, measuring, text search and its revisions.
Read the docs on Sheet viewerDocuments
The project’s filing cabinet, where its documents are uploaded, filed and found.
Read the docs on DocumentsTransmittals
Issue documents to an outside party with a cover sheet and a record of what happened to each copy.
Read the docs on TransmittalsSpecifications
The project manual, its sections grouped by CSI division.
Read the docs on SpecificationsSubmittals
Shop drawings and product data routed through a multi-step review to a stamped disposition.
Read the docs on SubmittalsRFIs
A question, the people it was issued to, their replies and the official response.
Read the docs on RFIsObservations
Log what you saw on a walk, then tell the team as a separate act.
Read the docs on ObservationsSchedule
A WBS grid and Gantt, and a lookahead board for the next one to four weeks.
Read the docs on ScheduleDaily logs
One record per day, locked once it is completed.
Read the docs on Daily logsPunch list
Corrective work tracked through the assignee, the punch manager and the final approver.
Read the docs on Punch listMeetings
Agenda and minutes in one record. Open items carry into the next meeting.
Read the docs on MeetingsInspections
Checklists run in the field, with signatures. A failed line becomes a punch item or an observation.
Read the docs on InspectionsSafety
Incidents with their investigation and corrective actions, and toolbox talks with attendee signatures.
Read the docs on SafetyPhotos
Albums, capture dates read from the camera, and tags by trade and location.
Read the docs on Photos
The record everything stands on.
The other four products run on the same project record.
STRUX AI agents
Reads the drawings, specs, RFIs and submittals, and answers with the sheet it came from.
VANTAGE 3D build and review
Reads the processed documents, the schedule, and the RFIs and submittals on the project.
Ledger Financials
Runs on the project’s own budget codes. A change event often starts from an RFI or a submittal.
ACx Commissioning
Its checklists run as inspections, and its issues log is the project’s observations.
Struxen Core Project management Free