The product

It doesn’t just read your set. It models the whole project.

The problems that cost you the most rarely announce themselves. STRUXEN’s agents read every drawing, spec, schedule, and submittal, then build a 3D Digital Twin of your project. They catch what reading each sheet on its own would miss.

The lineup

One platform. Four instruments.

Every agent works from the same model of your project: every drawing, spec, schedule, and submittal, read in full.

Autonomous build review · Optional add-on

AI agents build your project virtually and find the problems before they cost you.

VANTAGE reads the full set and builds the project the way a field team would: grid first, then structure, then the trades. Every clash, gap, and missing detail it hits along the way becomes a finding, cited to the sheet. The build is the review.

Documented catcheson real, finished project sets

  • No BIM required
  • Works from the PDFs you already have
  • Findings become RFIs in Autodesk Forma
  • Advised by working builders

Ask STRUX anything about the job, and see the sheet behind every answer.

RTU-1 → CKT 5,7,9 → PANEL H2 → ROOM 214cited E-601 · E-401 · M-501

2418 Northgate DC · complete
What electrical panel and circuit feeds RTU-1, and where is it located?
Plans & SpecsProject DataScheduleWebRun
STRUXAGENT
Tracing RTU-1 through the project graph…
fed bycircuitlocated inRTU-1Panel H2Ckt 5,7,9Room 214

RTU-1 is fed from panel H2, breaker 5/7/9: a 3-pole 60 A / 208 V circuit.

Panel H2 is in the 2nd-floor Electrical Room (Room 214), about 55 ft from the unit on the roof.

RTU-1 · POWER
Panel
H2
Breaker
5 / 7 / 9 · 3-pole
Rating
60 A · 208 V / 3φ
Location
Electrical Room 214 · Level 2
Feeder run
 55 ft to roof
E-601 Panel ScheduleE-401 Roof Power PlanM-501 Mechanical Schedules
2418 Northgate DC · Submittal review
SUBMITTAL 23 74 13-01· Packaged Rooftop Units · Product Datap. 2 / 8

Carrier  ·  Model 48TC-2034

Nominal cooling
60 tons
Supply airflow
18,000 CFM
External SP
1.5 in. wg
MCA
52 A
MOCP
60 A
Disconnect
Field-supplied
Sound
78 dBA
Refrigerant
R-32
STRUXSUBMITTAL
REVISE & RESUBMIT3 of 8 items don’t conform
  • Supply airflow 18,000 CFM is below the 20,000 CFM scheduled for RTU-1.M-501 · Schedule
  • MCA 52 A exceeds the 48 A continuous limit on the 60 A circuit.E-601 · Panel Schedule
  • Disconnect is field-supplied; the spec requires a factory-mounted disconnect.23 74 13 §2.3.B

Undersized airflow won’t meet the design load and the field disconnect fails the spec. Send back for a compliant unit.

Every submittal, checked against the spec line by line.

STRUX flags what doesn’t match: approve, approve as noted, or send it back.

8 items checked · 3 non-conforming · verdict REVISE & RESUBMIT§23 74 13

New drawings in. STRUX tells you exactly what changed.

It flags every add, delete, and move, sheet by sheet.

REV 3 → REV 4 · 3 CHANGES · 1 ADDED · 1 REVISED · 1 MOVEDsheets A-201 · S-301

2418 Northgate DC · revision overlay
A-201· Level 2 Floor PlanRev 3 ▸ Rev 4changed
STRUXREVISIONRev 3 → Rev 4

3 changes detected

  • ADDEDA-201Grid line C.5 added between C and D
  • REVISEDS-301Bay 2 to 3 column spacing 24’-0″ 26’-0″
  • MOVEDA-201Door 214A relocated 2’-0″ north

Rev 4 widens bay 2 to 3 and adds grid C.5. Coordinate with structural before fabrication.

2418 Northgate DC · Workflow run
Electrical / Mechanical power cross-check
From your checklistCoordination

Matches mechanical equipment loads to the electrical panel circuits and flags every mismatch.

Agent steps

  1. Read mechanical equipment schedules
  2. Read electrical panel schedules
  3. Match each unit to its circuit
  4. Flag mismatched loads and missing circuits
STRUXWORKFLOWS
Run complete3 findings
  • RTU-4 MCA 52 A exceeds the 48 A on circuit HP-2/4.E-601 · Panel Schedule
  • AHU-2 has no matching circuit in the panel schedule.E-602
  • CU-3 scheduled at 208 V, fed from a 480 V panel.M-501 · Schedule

Power mismatches like these stall equipment start-up in the field. Caught here, they become RFIs before the panels ship.

Build your own checks. STRUX runs your checklist across your entire project.

Describe what to verify, or upload your QA/QC checklist, and STRUX turns it into a reusable agent workflow that runs across your whole set. No Vantage required.

4 agent steps · 3 findings · category CoordinationFrom your QA checklist

Desk to field

Deep reviews at your desk. Quick answers in the field.

It’s the same project model everywhere: run preconstruction and constructability reviews in the office, then pull up answers in your hand on site. No app to install; it just works on the devices your team already carries.

In the office

Model the whole project and run preconstruction & constructability reviews on the desktop, every finding source-cited and ready for the team.

In the field

Your superintendent asks a question on a phone or tablet and gets an answer in seconds, on the spot, no calling back to the office.

Put STRUXEN to work on your project.